AUTHORIZED VENDOR · PM Surya Ghar Muft Bijli Yojana₹78,000 subsidy direct to your bank25-Year Warranty · BIS-Certified1,200+ Homes powered across Bihar & HaryanaBSEB · DHBVN · UHBVN net meteringGST 10JMDPD7669Q1ZG · Udyam BR-25-0027284AUTHORIZED VENDOR · PM Surya Ghar Muft Bijli Yojana₹78,000 subsidy direct to your bank25-Year Warranty · BIS-Certified1,200+ Homes powered across Bihar & HaryanaBSEB · DHBVN · UHBVN net meteringGST 10JMDPD7669Q1ZG · Udyam BR-25-0027284
SOLAR ALMANAC·VOL. I·ISSUE 06
Authorized Vendor · PM Surya Ghar Muft Bijli Yojana

Free your roof.Free your bill.घर घर सोलर · रोशन घर, हल्का बिल

Rooftop solar with end-to-end paperwork for the PM Surya Ghar Muft Bijli Yojana — central subsidy up to ₹78,000 credited directly to your account. Twenty-five winters of warranty. Five years to pay it back.

Cartoonish 3D Indian home with rooftop solar panels
Plate 01Rooftop Solar HomeScale 1:32
Today's Numbers
Max subsidy
₹78,000
Bill savings
~90%
Warranty
25 yrs
Payback
3–5 yrs
No. 01
1,200+
Solar Systems Installed
No. 02
1,100+
Happy Customers
No. 03
13+
Cities Covered
No. 04
₹5+ Cr
Total Savings Generated
Article I · PM Surya Ghar Yojana

Subsidy, straight to your bank.

As an authorized vendor, we file your application, coordinate with the DISCOM, and watch the disbursement until it lands in your account. You pay nothing for paperwork.

FOOTNOTE

"Subsidy is capped at ₹78,000 for residential systems of 3 kW and above. The same maximum applies whether you install 3 kW, 5 kW or 10 kW."

SYSTEM · 01

1 kW

Suitable for small homes
Central Subsidy
₹30,000
System cost
₹70,000
Your cost
₹40,000
SYSTEM · 02MOST PICKED

2 kW

Most popular for 1–2 BHK
Central Subsidy
₹60,000
System cost
₹1,40,000
Your cost
₹80,000
SYSTEM · 03

3 kW & above

Subsidy is capped at ₹78,000 — same for 3 kW, 5 kW or 10 kW systems
Central Subsidy
₹78,000
System cost
₹2,10,000+
Your cost
₹1,32,000+
Check Subsidy Eligibility
Article II · Timing

The most expensive choice is waiting.

Three reasons people in Bihar and Haryana stop researching and start installing.

I.+10%/yr

Rising tariffs

Electricity rates climb every year. Solar locks your energy cost at near-zero for 25+ years — a one-time decision that pays for the next two decades.

II.4–8 hrs

Power cuts

Load-shedding in Bihar and Haryana disrupts work and study. A hybrid solar system with battery keeps the lights on through the longest outages.

III.0 say

No control

You can't negotiate with the grid. Solar makes you grid-independent — your roof, your generation, your terms.

Article III · The Process

From enquiry to switching on in 30 days.

Five orderly steps. We carry the paperwork — you carry only the savings.

01

Free Site Survey

Our experts visit your location to assess roof space, sun exposure, and electricity needs

02

Custom Quotation

Receive detailed proposal with system design, cost breakdown, and subsidy calculation

03

Subsidy Application

We handle all paperwork for PM Surya Ghar scheme and government subsidy approval

04

Professional Installation

Certified technicians install your solar system with quality materials in 2-3 days

05

Net Metering Setup

Complete electricity board coordination and net metering connection for sell-back benefits

Article IV · Field Notes

Real homes. Real savings.

A small selection from 1,200+ rooftops we've powered.

FILE · 001
"Excellent service! My electricity bill dropped from ₹4,500 to just ₹500. Installation was professional and subsidy process was handled smoothly."
Rajesh Kumar
Gaya, Bihar · 5 kW
FILE · 002
"Very happy with the 3kW system. Team was professional and completed installation in 2 days. Already seeing savings in my bill."
Priya Singh
Patna, Bihar · 3 kW
FILE · 003
"Got solar installed on my rooftop in Gurugram. Ghar Ghar Solar handled everything — subsidy, net metering, DHBVN paperwork. Highly recommended!"
Amit Sharma
Gurugram, Haryana · 4 kW
FILE · 004
"Saving ₹3,000 every month after installation. The team explained every step clearly and the subsidy came in just 45 days."
Sunita Devi
Nawada, Bihar · 3 kW
FILE · 005
"Best solar company in Hisar. They installed our 5kW system in 2 days and handled the full UHBVN net metering process."
Vikas Yadav
Hisar, Haryana · 5 kW
FILE · 006
"Professional team, great quality panels. Our electricity bill is almost zero now. Very happy with Ghar Ghar Solar."
Mohan Lal
Rohtak, Haryana · 3 kW
Article V · Coverage

Local crews. Same-day surveys.

On-ground installation teams across Bihar and Haryana.

Article VI · Questions

What people actually ask.

COLOPHON · ISSUE END

Switch off your bills.
Switch on your roof.

Free site survey. Subsidy paperwork on us. Installed and commissioned in 30–45 days.