Blog Details

Renewable Energy
Author
Ritesh Kumar

Hasua mein solar panel lagwane ka sahi tarika kya hai?

Hasua mein rooftop solar panel lagwane ka sahi process kya hai? Janiye site inspection se lekar installation aur subsidy tak ka step-by-step guide is Hinglish blog mein.

Hasua ke log solar panel kyu lagwa rahe hain?

Hasua mein bijli ka kharcha badhne ke saath-saath power cuts bhi common ho gaye hain. Isliye log ek reliable aur sasta solution dhoond rahe hain, aur uska jawab hai — Rooftop Solar Panel System.

Lekin logon ke mann mein ek sawaal hai: lagwane ka sahi tarika kya hai?

Step-by-Step Solar Installation Process in Hasua

Step 1: Load Calculation

Sabse pehle aapke ghar ka electrical load calculate hota hai — kitne ACs, fans, fridge, etc. Jisse pata chalta hai ki aapko kitna kW ka system chahiye.

➡️ Example: 2 AC, 1 fridge, 8 fans ke liye 3kW system suitable hota hai.

Step 2: Rooftop Survey

Solar expert aapke ghar aakar rooftop ka inspection karta hai:

  • Area available
  • Sunlight exposure
  • Shadow-free zone
  • Roof type (concrete, tin, etc.)

Step 3: System Design & Quotation

Based on load and roof, aapko milega:

  • 3D system layout
  • Panel placement diagram
  • Final price with subsidy calculation

Step 4: Government Portal Registration

PM Surya Ghar Yojana mein apply karne ke liye vendor portal par registration karta hai:

  • DISCOM approval
  • KYC upload
  • Consumer ID verification

Step 5: Installation

  • Structure fitting (tilted iron frames)
  • Solar panel mounting
  • Wiring + Inverter + Distribution box installation
  • Earthing & lightning protection

Step 6: Net Metering

DISCOM ka engineer visit karke net meter install karta hai. Isse aap grid ko extra electricity bech sakte hain.

Step 7: Testing & Activation

System full check ke baad activate hota hai. Aapke mobile par monitoring app bhi setup hoti hai.

Required Documents

  • Aadhar Card (self-attested)
  • PAN Card (self-attested)
  • Recent electricity bill
  • Photo & cancelled cheque

Important: Sabhi documents mein naam electricity bill ke naam se match hona chahiye.

Subsidy Details

System SizeGovernment SubsidyFinal Price (approx)1kW₹30,000₹75,0002kW₹48,000₹132,0003kW+₹78,000₹114,000 (after Ghar Ghar Solar discount)

Installation Timeline

  • Site Visit: 1 day
  • Govt Registration & Approval: 5-7 days
  • System Installation: 2-3 days
  • Net Metering Activation: 7-10 days

Total: ~15-20 days mein full solar system active

EMI & Payment Options

Ghar Ghar Solar Hasua mein EMI plans offer karta hai:

  • No cost EMI
  • 3k/month se shuru
  • Credit card / debit card / UPI accepted

Why Ghar Ghar Solar?

  • Local support team in Hasua
  • Govt authorized vendor
  • Site visit + load analysis FREE
  • Post-installation service & monitoring

Final Thought

Hasua mein solar lagwana ab mushkil nahi raha. Agar aap process samajh jaayein aur ek trusted vendor se kaam karwayen, toh aapka bijli ka bill zero ho sakta hai.

Ab bijli ka bill nahi, sirf saving aur green energy!

Book Karein Free Rooftop Survey

Apna solar journey start karein sirf ek free visit se:

🔗 https://www.ghargharsolar.in/book-a-meeting

Chat on WhatsApp